A textile mill that cut its diesel hours by two thirds
Grid outages meant hours of diesel generation every day. We sized a solar and battery hybrid around the outage pattern, not around the bill.
- Diesel hours cut
- 68%
- Simple payback
- 3.9 yrs
- PV installed
- 2.2 MWp
- Battery
- 1 MW / 2 MWh
- The site
- Spinning mill drawing up to 2.4 MW, running three shifts, with 3 MW of diesel generators as backup.
- The constraint
- Daily grid outages and rising diesel prices. The export limit set by the distribution company ruled out a large export-led solar system.
- What we modelled
- Eighteen months of outage logs and generator fuel records, PV yield for the roof and an adjacent plot, and battery sizes from 0.5 to 3 MWh.
- What we chose
- 2.2 MWp of PV with a 1 MW / 2 MWh battery and a controller that ramps the gensets down before they start.
- What we advised against
- A generic 1 MW battery sold for peak tariffs. It would have sat full during most outages and run flat in the longest ones.
- The return
- Diesel running hours fell 68% in the first year, with a projected payback of 3.9 years at current fuel prices.
The question
The mill was spending more on diesel than on grid electricity. The owners asked whether solar and storage could change that, and by how much.
What we did
We built the case around the outage pattern rather than the tariff. Generator fuel logs showed when the site was islanded and for how long. We sized the battery to carry the site through the typical outage and hand over to the gensets in the long ones, so they run at efficient load instead of idling.
What changed
The generators now start less often and run closer to their rated load when they do. The solar array is sized to the export limit the distribution company allowed, so no application had to be fought.
- Feasibility and sizing
- Business case
- Grid connection and compliance
- Specification and handoff