Battery and on-site energy advisory

Size the battery to your site, not to the catalogue.

From first business case to bid-ready specification, we model your site until the configuration is the best one available to you, not the one that fits a standard product. You commit capital knowing what you're buying and what it returns.

With several years of advisory experience behind us, across Pakistan, the US, the EU and the UK.

12:10Solar covers the site and charges the battery
SOC45%
PV · 400 kWpBESS · 500 kW / 1,100 kWhSITE LOADLV BUSBARPOC · 1.5 MVAGRID
DRG ZE-001Typical commercial siteNot to scale

Approach

Move the battery. Watch the peak.

Every recommendation we make starts like this, with your own data. Drag the sliders and see the trade-off between power and energy for yourself.

Example: one weekday at a commercial site

48 half-hourly readings. Load your own export to see your site.

Peak without battery
–
Peak with battery
–
Peak cut
–
Duration
–

This is a first look, not a recommendation. A real study adds tariffs, recharge windows, degradation and a year of data. That is where the right size usually differs from this one.

You commit capital knowing what you're buying and what it returns.
The catalogue answer1 MW / 2 MWh

The supplier's standard container, sized to their product range.

The modelled answer500 kW / 1,100 kWh

Sized to the site's real peaks. It cost 40% less and saved almost as much.

From the UK cold-store case study below (sample)

Services

From first business case to bid-ready specification.

Take one step or all six. They run in this order because each one depends on the answer before it.

  1. 01

    Feasibility study and DER sizing

    We start from your half-hourly data, tariffs and site constraints, and work out what to install and how big.

    • Load and tariff analysis
    • PV yield and battery sizing across configurations
    • Constraint and risk register
  2. 02

    Business case and financial modelling

    Every configuration gets a full model: capex, opex, revenue streams, degradation, and the sensitivity of each.

    • Payback, NPV and IRR
    • Tariff and price scenarios
    • Board-ready summary
  3. 03

    Grid connection and compliance strategy

    We work out what your connection allows, what the network operator will accept, and the fastest way to get it.

    • Connection capacity review
    • Export and import limits strategy
    • Application support
  4. 04

    Controls and EMS specification

    The control strategy decides when the system charges, discharges, imports and exports. We write it before anyone builds.

    • Operating modes and priorities
    • EMS functional specification
    • Metering and data requirements
  5. 05

    Specification and handoff to EPC and suppliers

    A bid-ready specification, so suppliers quote against your requirements and not their standard product.

    • Technical specification and tender pack
    • Bid evaluation
    • Handoff to the chosen EPC
  6. 06

    Grant and subsidy application supportPremium

    We find the funding that fits the project, then prepare and manage the application with you.

    • Funding search for your market
    • Application writing
    • Follow-up with the funder

Where we work

Four markets. Different reasons to build.

Pakistan

What drives the case
Grid outages, diesel backup costs and rising industrial tariffs.
What we handle
Distribution company connection and net-metering rules under NEPRA.

United Kingdom

What drives the case
Peak-time network charges and import capacity limits.
What we handle
Network operator connection applications, export limits and flexibility revenue.

European Union

What drives the case
Grid congestion, connection queues and dynamic tariffs.
What we handle
Behind-the-meter storage to unlock EV charging and heat pumps on existing connections.

United States

What drives the case
Demand charges set by single 15-minute intervals.
What we handle
Utility interconnection, plus federal and state incentives, which depend on project start dates.

Send us your site

Start with the data you already have.

A year of half-hourly meter data and a recent bill is enough for a first view. We reply within one working day and tell you whether a full study is worth it.

  • Half-hourly or 15-minute meter export (CSV)
  • Two or three recent electricity bills
  • Site plan or roof drawings, if you have them
  • Any supplier quotes you want checked