← All case studies
A plant that turned demand charges into a solved problem
Demand charges made up 40% of the electricity bill. We specified a battery and controls that hold the monthly peak flat.
- Billed demand cut
- 24%
- Simple payback
- 6.2 yrs
- Battery
- 750 kW / 1.5 MWh
- Interval data
- 15 min
- The site
- Injection moulding plant with a 3 MW peak and large motor start-ups that spike demand.
- The constraint
- Monthly demand charges set by single 15-minute intervals, plus summer price spikes on the wholesale market.
- What we modelled
- 15-minute interval data for two summers, ratchet clauses in the tariff, and battery sizes from 250 kW to 1.5 MW.
- What we chose
- A 750 kW / 1,500 kWh battery with a controller tuned to motor start-up events and summer price signals.
- What we advised against
- A 2-hour battery sized for energy arbitrage alone. It missed the short spikes that actually set the bill.
- The return
- Monthly billed demand fell 24%, with a simple payback of 6.2 years before incentives.
The question
The plant’s managers knew demand charges were the problem. They didn’t know which battery would fix them.
What we did
We found that a handful of motor start-ups each month set the billed peak. Those spikes are short, so the battery needed power more than energy. We wrote the control logic around them, then layered summer price response on top.
What changed
The billed peak is now flat month to month. The incentive application, prepared alongside the specification, improves the payback further once approved.
Services on this project
- Feasibility and sizing
- Business case
- Controls and EMS
- Grant and subsidy support