← All case studies
United StatesHouston area, TexasPlastics moulding plantSample case study

A plant that turned demand charges into a solved problem

Demand charges made up 40% of the electricity bill. We specified a battery and controls that hold the monthly peak flat.

Billed demand cut
24%
Simple payback
6.2 yrs
Battery
750 kW / 1.5 MWh
Interval data
15 min
The site
Injection moulding plant with a 3 MW peak and large motor start-ups that spike demand.
The constraint
Monthly demand charges set by single 15-minute intervals, plus summer price spikes on the wholesale market.
What we modelled
15-minute interval data for two summers, ratchet clauses in the tariff, and battery sizes from 250 kW to 1.5 MW.
What we chose
A 750 kW / 1,500 kWh battery with a controller tuned to motor start-up events and summer price signals.
What we advised against
A 2-hour battery sized for energy arbitrage alone. It missed the short spikes that actually set the bill.
The return
Monthly billed demand fell 24%, with a simple payback of 6.2 years before incentives.

The question

The plant’s managers knew demand charges were the problem. They didn’t know which battery would fix them.

What we did

We found that a handful of motor start-ups each month set the billed peak. Those spikes are short, so the battery needed power more than energy. We wrote the control logic around them, then layered summer price response on top.

What changed

The billed peak is now flat month to month. The incentive application, prepared alongside the specification, improves the payback further once approved.

Services on this project
  • Feasibility and sizing
  • Business case
  • Controls and EMS
  • Grant and subsidy support